The Baihetan Power Station to Jiangsu ±800kV UHV DC line was completed and put into operation |
发布日期:2022-7-8 新闻来源: |
It is Geko’s great honor to cooperate with State Grid Corporation of China, to offer the electric ball valve to converter oil drainage system. Geko ball valves of long life and safe operation in tough services to ensure the stable operation of the equipment of State grid UHV DC transmission system. On July 1, 2022, the Baihetan-Jiangsu ±800 kV UHV DC Project of State Grid Corporation of China (referred to as the "Baihetan-Jiangsu Project") was completed and put into operation. The electric energy across more than 2,000 kilometers was sent to Jiangsu via the Baihetan electric energy "West-East Power Transmission" . Baihetan Hydropower Station will become the second largest hydropower station in China and even in the world. This giant hydropower station with an installed capacity of 16 million kilowatts will generate more than 60 billion kWh of electricity every year. |